The Real Cost of a Handoff
What we measured when we tracked how long design decisions survived contact with engineering.
Contents
The Real Cost of a Handoff
Across a handful of client engagements, we tracked how many design decisions were quietly overturned during implementation - not because they were wrong, but because nobody in the room during implementation had the context to defend them.
The number was higher than anyone expected. This is what we changed.